Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9071

Control Material Ship Date

$
0
0

Hello SAP experts,

 

I have the following requirement from the business:

 

Ability to control when a material can be shipped - business wants to specify specific date ranges that a material can be shipped (i.e. planned GI). If a material's planned GI falls before or after the date range, we want system to throw a message. This scenario is for holiday specials where product is created specifically for the holidays (e.g. Halloween) and business doesn't want the product to be ordered/shipped outside the holiday date range.

 

I know the latter part of the requirement (i.e. message) might be something custom. But I wanted to see if there was standard way to control when a material was available.

 

We are NOT using availability check and ATP is turned off (it's a make-to-order scenario).

 

Any insight on how to meet this requirement is appreciated!


Viewing all articles
Browse latest Browse all 9071

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>